Capacity: 100 000 ton/year/shift
Raw material: sand and gravel
Plant is located approx. 10 km north of Jesenik. Raw material is exploited in two benches.
The products are usable into concrete mixtures of lower quality, into sub-basis and back fill, as drain layer, under lock pavement and other specific use.
Production line is very flexible and capable of fulfill all specific needs of customers. All products are certified.